• Warm the subgrade: If the ground is frozen, it can pull heat away from the concrete, slowing curing and causing uneven results. Use ground heaters, or insulated blankets, to warm the subgrade before you pour.
• Protect against wind chill: Wind can rapidly cool freshly poured concrete, so setting up windbreaks or tarps around the site can make a big difference.
• Plan for access accommodations: If equipment or workers struggle to navigate icy or snowy conditions, take steps to improve access – gravel, salt or sand can help stabilize the area.
Investing time in site prep might feel like an extra hassle, but it’ s a small price to pay for concrete that performs well in the long term.
Choosing the Right Mix for Winter
Not all concrete mixes are created equal, especially in